Description
- Finishing grouting of plasterboard joints (Q2)
- Full surface thin-layer levelling of plasterboard surfaces (Q3, Q4)
- Full-surface thin-layer levelling of mineral substrates
Ready-mixed finishing compound for smooth pointing and skimming of indoor mineral substrates
Excellent adhesion
Perfect surface smoothness
Low shrinkage
Suitable for humid locations (bathrooms or kitchens)
Suitable for application with power tools
Suitable as finishing compound for fire-rated partitions (Q2, Q3, Q4)
Type
EN 15824:2017
Reaction to fire
A2-s1, d0 — non-flammable
Maximum thickness
0-3 mm in single coat application
Application temperature
+10°C to +25°C
Yield
0.10 kg/m2 for pointing drywall panel joints (Q2)
1.5 kg/m2/mm for full-surface levelling (Q3, Q4)
Adhesion strength
≥ 0.3 MPa
Shelf life
12 months
Containers
Pails: 20 kg (33 pcs. per pallet)
SUBSTRATE PREPARATION
The substrate should be dry, sound, and free of grease, dirt, dust and loose particles. If highly absorbent or unsound, stabilize the substrate with a deeply penetrating primer, e.g. Knauf Universalgrund.
COMPOUND PREPARATION
Stir the compound lightly by hand or with a low-speed mixer before application. If applying using a power tool, the compound can be thinned a bit by adding some clean water. Stir the compound after adding water. Use clean tools.
COMPOUND APPLICATION
The compound can be applied both by hand using a trowel or smoothing roller or with power tools. The maximum single coat thickness must not exceed 3 mm.
APPLICATION CONDITIONS
Install the Norgips drywall cladding after in-situ construction has been completed and the location has been ventilated or dried to reduce the airborne humidity.
Install the drywall panels and point their joints at an air temperature above +5°C and below 70% RH.
ADDITIONAL INFORMATION
News
Find out about current events and new products from Norgips
The finals of the 54th edition of the ‘Golden Trowel’ Construction Tournament took place at this year's BUDMA trade fair in Poznań on 3-6 February 2026. As a partner company cooperating with Castorama Polska, Norgips had the pleasure of supporting t…
GHB Group company Kantor organised a Construction Industry Fair on 13 September 2025 on the pre…
on 4 September, Peamco organised an Open Day at its Leszno warehouse. More than 20 exhibitors p…
How to make a partition wall correctly? What products should be used in loft? How much does the plasterboard weigh? Our technical advisors can answer these and your other questions.
A selection of downloads and material consumption calculations from our website can be included in the document folder.
Click'To folder' on any document or calculation.
With the document folder you can easily prepare documentation for your investment including: